van Heck, Netherlands
New conceptual design of warehouse management, material flow, and new order-picking strategies for more than 60,000 automotive products without interruption of operation:
By coordinating simultaneous changes in the entire storage area, SSI Schäfer as the general contractor enabled an increase in order-picking performance by 25 %.
Without interruption of operation, a new system design was developed and, at the same time, implemented:
New information- and control processes, steel construction for 26,000 bin storage locations in the small parts storage system, integration of four new storage and retrieval machines, new bin conveyor systems, and new order-picking workstations with Pick-by-Light systems.
Our scope of supply and services:
- Small parts storage system steel construction
- Bin conveyor system
- Control system
- Storage and retrieval machines (SRM)
- Warehouse management system
- Transport and storage bins
- Visualization
- Pick-by-Light
Download Case Study
Further information:
SSI Schäfer Noell GmbH, Phone: +49/9334/979-0, E-Mail: info@ssi-schaefer-noell.com
Logistic Systems
Case Studies

