3M, Jüchen (Germany)

In the e-business market, the fast and productive order-picking of small quantities is decisive for a company´s success.

 

The 3M Group has set new standards with the construction of this first fully automated warehouse worldwide:

Throughput times have been reduced from two to one day, orderl ines to be handled have been doubled from 5,000 to 10,000 per day, and storage capacity has been increased from 40,000 to 60,000 pallet storage locaitons. With SSI Schäfer´s logistics concept even small volumes of the product line consisting of about 20,000 items can be delivered promptly. All extension buidlings and the new tray storage system were completed within the record time of twelve months as requested by the customer at the outset.

 

 

 

Our scope of supply and services:

New building, extension and continuation to the existing goods distribution center

 

  • General contractor
  • Structural engineering and HVAC
  • Extension of the bin conveyor system and connection to the existing bin conveyor system
  • New construction of the pallet conveyor system
  • New construction of the tray conveyor system with fully automatic tray storage system
  • Extension of the shipping area
  • Creation of three order-picking workplaces (Goods-to-Man)
  • Warehouse management and control systems

 

 